How Much Extra Material Should You Buy?

By the TapeMeasureCalc team · Updated · 6 min read

The area of a room is not the amount of tile you need, and the volume of a slab is not the amount of concrete that turns up on the truck. Every material order needs a margin for cutting, spilling, settling and the odd broken piece. Too little and you’re stuck mid-job; too much and the leftovers sit in the garage for years. Here’s how to pick the margin.

Why you can't order the exact amount

  • Cuts. Tiles, pavers, boards and sheets get cut at every edge, and an offcut from one side rarely fits the other.
  • Breakage. A few pieces crack in transit or during cutting.
  • Uneven ground. A subgrade that dips half an inch swallows concrete and gravel.
  • Settling and compaction. Mulch, soil and crushed stone all take up less space once they’re watered or rolled.
  • Spillage. Some concrete always stays in the chute, the wheelbarrow and the mixer.

Starting points by material

These are common rules of thumb, not standards. Use them as a starting point, then adjust for your site and your installer’s advice.

MaterialTypical allowanceGo higher when…
Ready-mix concrete5–10%the ground is uneven or the forms are hand-built
Floor and wall tile10%diagonal or herringbone layouts, small rooms, large-format or natural stone tiles (15–20%)
Pavers5%herringbone, angled patterns or curved edges (10% or more)
Drywall / plasterboard10%lots of corners, short walls, sloped ceilings
Gravel and road base5–10%the material compacts a lot; ask the supplier
Mulch and soila little extra, or top up laterthe material is light and fluffy

What running short really costs

The extra material is rarely the expensive part. Running short is. With concrete, a second delivery can mean fresh concrete meeting concrete that’s already started to set, which leaves a weak joint. With tile, a top-up order may come from a different production batch with a slightly different shade, and it shows. With anything delivered, there’s a second delivery charge.

So for most materials, it pays to round up. Bulk materials are the exception worth thinking about: an extra half yard of mulch you don’t need still has to go somewhere.

Leftovers worth keeping

  • A few spare tiles, pavers and fence boards, for repairs later. Matching them in five years is hard.
  • A small, labelled amount of each paint colour, for touch-ups.
  • Unopened bags of concrete or grout, kept dry. Opened bags pick up moisture and don’t keep well.

Waste in the calculators

The calculators that need it have a waste or extra field you can change, with a sensible default: 10% on the tile calculator and concrete calculator, 5% on the paver calculator. Results show the quantity with and without waste, so you can see exactly what the allowance adds.